The first section is focused for completion in 2028 at a dealing with capability of 4 million Twenty Foot Equivalent Units (TEUs). A TEU is an approximate unit of measure used for cargo containers. The capability of the port will improve to 16 Million TEUs within the final stage of improvement.
“Progressive steps are being taken by the government under the leadership of Prime Minister Narendra Modi. The transhipment terminal will offer top notch facilities to the stakeholders in the maritime trade sector,” Sarbananda Sonowal. Minister for Ports, Shipping and Waterways advised ET in New Delhi.
“The estimated cost for Phase 1 of the proposed transhipment port is around Rs 18,000 crore which includes the construction of breakwaters, dredging, reclamation, berths, storage areas, building and utilities, procurement and installation of equipment and development of port colony with core infrastructure is going to be developed with the government support,” the assertion stated.
It can be deliberate that Public Private Partnership (PPP) can be inspired for this mission through Landlord mode. The PPP Concessionaire shall have the flexibleness to develop storage space, container dealing with gear and different infrastructure primarily based on concessionaire’s personal market and enterprise evaluation topic to the Minimum Guaranteed Traffic.
The Concessionaire can be awarded a long-term PPP concession of 30 to 50 years (primarily based on requirement), shall be answerable for the availability(s) of port companies and shall have the rights to levy, accumulate and retain fees from port customers.
In one other improvement, Sonowal inaugurated the National Logistics Portal-Marine, a Single Window Logistics Portal to cut back the logistics value for exporters. Addressing the gathering, he stated that NLP (marine) is an open platform that permits the coexistence of a number of service suppliers to supply EXIM-related companies independently or by combining completely different connectivity choices.